Optimized techniques for fabricating the secondary lining of a two-storey shallow subway station with single arch and one row of columns excavated by mining method 单拱单柱双层浅埋暗挖地铁车站二次衬砌优化施工技术
Secondary development of ANSYS for computation of multiple bearing point row pile 多支点排桩计算ANSYS二次开发技术研究